Ropeway consulting & engineering · since 2013

# Our experience
is your safety.

Independent planning, line calculation and masterplanning for ropeways, plus inspection and acceptance in cooperation with WPK Austria – from conception to commissioning, in the Alps and worldwide.

T1T2T3T4 VALLEY STATION MOUNTAIN STATION VERTICAL RISE HORIZONTAL LENGTH ROPE LINE · EMPTY ROPE LINE · MAX. SAG
2013
founded in Vintl, South Tyrol
150+ references
ski, urban, touristic and material ropeways
18+ countries
from the Alps to India, Nepal and the Gulf
up to 8 %
cost savings through competitive tendering
Services

Consulting, engineering and inspection – from one network.

Our shareholders are formerly certified engineers of one of the world's leading ropeway manufacturers – with proven track records across many countries.

Ropeway Engineering

Project engineering for new and second‑hand ropeways, special and material ropeways.

  • Line, static and safety calculations
  • Execution project ropeway / civil works
  • Tendering and procurement

Inspection & Safety Audits

Periodic and acceptance inspections in cooperation with the accredited inspection body WPK Austria.

  • EN 1709 and SeilbÜV 2013
  • Components incl. NDT
  • Safety audits per CEN standards

Urban Ropeways

Ropeways as public transport – feasibility, route options and programme management.

  • Demand and capacity analysis
  • Route and station evaluation
  • Economic and political feasibility

Masterplanning

Strategic planning for ski areas and mountain resorts – summer and winter.

  • Vision, concept and phasing
  • Lift and trail layout, capacity
  • Architecture of stations
Why independent planning

Planned for your goals – not for a manufacturer.

01

Client-first optimisation

Planning aligned with your goals, not with manufacturer constraints.

02

Manufacturer-independent design

Neutral design without preference for any supplier.

03

Context-sensitive planning

Environmental, geological and spatial conditions in mind.

04

Stronger negotiation position

Target costs create transparent, comparable supplier offers.

05

Risk minimising

Obstacles identified and addressed early.

06

Increased safety

Systematic evaluation of technical options to maximise safety.

07

Early start of approvals

Permitting can begin before manufacturer selection – saving time.

08

Cost savings up to 8 %

Competitive tendering reduces cost while keeping quality and performance.

How we work

From conception to official approval.

  1. PHASE 1
    Conception
    Site visit or Google Earth analysis, feasibility study, traffic studies, system selection, cost estimate.
  2. PHASE 2
    Planning
    Line axis, positioning of stations and towers, building permission, tendering.
  3. PHASE 3
    Engineering
    Execution project, line and static calculations, loads between steel and civil works, architecture.
  4. PHASE 4
    Realisation
    Project management civil works and assembly, internal tests and commissioning; acceptance inspection in cooperation with WPK Austria and assistance with official approval.
References

From city centres to the Himalayas.

Full reference list →
Station of the new Ochsenkopf gondola lift
Germany · 10-seater gondola

New Ochsenkopf Ropeway

Replacement of two chairlifts in the Fichtelgebirge: concept, business plan, permits, station architecture and tender documents.

Visualisation of an urban ropeway station in Duisburg
Germany · Urban ropeway

Duisburg Urban Ropeway

5.3 km link from the main station to the new 6‑Seen‑Wedau district: route options, capacity, preliminary planning and feasibility.

Visualisation of a ropeway crossing the Rhine in Cologne
Germany · Urban ropeway

Inner Rhine Shuttle, Cologne

Feasibility study for KVB: 3S and reversible ropeway options across the Rhine, compared with a water-bus concept.

Longitudinal profile drawing of the Kedarnath ropeway
India · 5× 3S, 4× MGD

Kedarnath & Hemkund

Feasibility, project engineering, DPR and tendering for nine new gondola lifts (2022–2023).

Material cableway carrier at Phajoding monastery
Bhutan · Material ropeway

Phajoding Monastery Cableway

Design, line calculation, tower and foundation analysis, installation and commissioning for a monastery restoration.

Material ropeway with containers in Saudi Arabia
Saudi Arabia · EPC

Gondola & Material Ropeway, AlUla

Up to 4,000 p/h for a hotel construction site – with partners of the Ropeway Project Group.

Reference list

A selection from more than 150 references.

Download as PDF →
Year Project System Country Client Scope of services
2025 – ongoing Bonn MGD, 2 sections Germany City of Bonn Feasibility, DPR, architecture, tendering, PMC
2025 – 2026 Detmold MGD Germany Drees & Sommer Feasibility study, DPR, architecture
2025 – ongoing Calw Jig-back gondola Germany City of Calw Feasibility, DPR, architecture
2025 – 2026 Stuttgart Detachable gondola Germany Robert Bosch Krankenhaus Consultancy, line and cost calculation
2025 – 2026 Leipzig – Markkleeberg Detachable gondola Germany Leipzig / Markkleeberg Feasibility study
2025 – ongoing Ex Kreuzwankelbahn Detachable chairlift Bulgaria Mountain Planning Complete ropeway engineering
2024 – 2025 Duisburg MGD, 2 sections Germany GEBAG Consultancy, line and cost calculation
2024 – ongoing Bönischovy Boudy Detachable chairlift Czech Republic Mega Plus Complete ropeway engineering
2024 – 2025 Ex Loser chairlift Detachable chairlift Poland PKL Complete ropeway engineering
2023 – 2026 Nainital MGD, 5 sections India NHLML Feasibility, DPR, architecture, tendering
2022 – 2023 Kedarnath 3S gondola, 4 sections India NHAI Feasibility, DPR, architecture, tendering
2022 – 2023 Hemkund MGD + 3S gondola, 4 sections India NHAI Feasibility, DPR, architecture, tendering
2022 Großer Feldberg Detachable gondola Germany Hochtaunuskreis Feasibility study, business case
2022 Rheinpendel Cologne 3S gondola, 5 sections Germany KVB Köln Feasibility study, business case
2022 – 2025 NEOM Material ropeway Saudi Arabia CDC Consultancy, line calculation
2022 – 2025 AlUla Material ropeway Saudi Arabia CDC Consultancy, line calculation
2022 Jebel Jais Air Bridge Self-propelled cable car, 2 sections UAE RAK Tourism Development Authority Feasibility study, business case
2021 – 2022 Cottbus Detachable gondola Germany City of Cottbus Feasibility study, business case
2021 – ongoing Pylypets Detachable gondola Ukraine Borzhava Asset Complete project and ropeway engineering
2021 Ghaziabad Detachable gondola India Ghaziabad Development Authority Feasibility, DPR, cost calculation
2021 Loser Panoramabahn Detachable gondola Austria Loser Bergbahnen Consultancy, safety report, line calculation
2021 Kotwanda Manma Jig-back gondola Nepal Ropeway and Cable Car Pvt. Ltd. Consultancy, line calculation
2021 Varanasi Detachable gondola India WAPCOS Consultancy, line and cost calculation
2019 Chukotka Jig-back gondola Russia CDC Feasibility, DPR, architecture
2019 – 2020 Klausen – Latzfons Detachable gondola Italy STA Südtirol Feasibility, DPR, architecture
2019 Tusheti Jig-back gondola Georgia CDC Feasibility, DPR, architecture
2018 – 2022 Polsterlift Fixed-grip chairlift Austria Präbichl Bergbahnen Complete ropeway engineering, permit project
2018 – 2019 Sheregesh Fixed-grip chairlift Russia STM Complete ropeway engineering
2018 – 2019 Muktinath Detachable gondola Nepal Muktinath Darshan Ltd. Feasibility, DPR, tendering
2018 – 2019 Lift F, Erzurum Fixed-grip chairlift Turkey Gultekin Enerji Endustri Complete ropeway engineering
2018 – 2019 Lift G, Erzurum Detachable chairlift Turkey Gultekin Enerji Endustri Complete ropeway engineering
2017 – 2023 Ochsenkopf Nord Detachable gondola Germany Zweckverband Fichtelgebirge Feasibility, DPR, architecture, tendering, PMC
2017 – 2024 Ochsenkopf Süd Detachable gondola Germany Zweckverband Fichtelgebirge Feasibility, DPR, architecture, tendering, PMC
2017 – 2018 Bolu Ropeway Detachable gondola Turkey Bolu Municipality Feasibility, DPR, architecture, tendering
2017 – 2018 Babanovac Fixed-grip chairlift Bosnia and Herzegovina Gardinia Complete ropeway engineering
2017 – 2018 Fužine Detachable gondola Croatia S.P. Fužine Complete ropeway engineering
2017 – 2019 Mountain Stepper Inclined elevator Austria Private client Complete engineering
2017 – 2019 8 urban ropeways Jig-back and detachable gondolas India Various government bodies Feasibility studies
2015 – 2016 Phajoding Material ropeway Bhutan AB Trader Ropeway engineering, project management
2015 – 2016 Bungee Ropeway Self-propelled gondola Turkey Bukla Turizm Feasibility study, DPR, engineering
2014 – 2016 Zahradky Detachable chairlift Czech Republic Mega Plus Complete ropeway engineering
2014 – 2017 Černý Důl Detachable chairlift Czech Republic Mega Plus Complete ropeway engineering
2014 Squaw Valley Detachable gondola USA SE Group Optimisation of the ropeway line
In‑house tools

ROPES LINEX – our own line calculation.

We calculate ropeway lines with software we develop and validate ourselves – for ski tows, chairlifts, gondolas and aerial tramways. Traceable, verifiable and delivered with the full set of standard checks.

  • Rope line, sag and tower forces for all load cases
  • Checks to EN 12929, EN 12930, EN 1908 and EN 13223
  • Calculation report and longitudinal profile as DXF
Longitudinal profile and site plan of a re-installed chairlift, calculated with ROPES LINEX
Example project: re-installation of a chairlift – longitudinal profile with site planCalculated with ROPES LINEX
Partners & network

Every discipline of a ropeway project – in one network.

As a member of the Ropeway Project Group, ROPES works with specialised partners for inspection, structural analysis, installation, masterplanning and operation.

Member of Ropeway Project Group
WPK Testing Inspection
Testing & inspection

WPK Austria GmbH

Accredited inspection body for periodic and acceptance inspections of ropeways and their components.

Kaprun, Austria · wpk-austria.at
INTALES
Structural analysis

INTALES GmbH

Consulting engineers in civil engineering: strength analysis of reinforced concrete and steel structures, static and dynamic component calculations.

Natters, Austria · intales.com
CDC Cableway Development Company
Installation & service

CDC Cableway Development Company

Internationally experienced installation company for the installation, maintenance and repair of cableways.

Aldein (BZ), Italy · cdc.company
VIDEST – From Vision to Destination
Masterplanning & snowmaking

Videst GmbH

Planning and consulting for master planning, snowmaking and infrastructure.

Brenner (BZ), Italy
claystreetX – creating sustainable connections
Operation & maintenance

claystreetX GmbH

Operation and maintenance of automated transport systems – sustainable O&M concepts for the highest safety and availability.

Dornbirn, Austria · claystreetx.com
dorfmann ingenieure
Engineering partner

Dorfmann Ingenieure

Joint partner on urban and mountain ropeway studies – Ochsenkopf, Cottbus and Duisburg among them.

Brixen (BZ), Italy · dorfmann.eu
Team

The people behind your project.

Portrait of Stephan Obexer

Ing. per. ind. Stephan Obexer

CEO · Shareholder
Ropeway engineer · Ropeway consultant & inspector
s.obexer@ropes.cc
Portrait of Mark-Oliver Löhr

Dr.-Ing. Mark-Oliver Löhr

Shareholder
Ropeway engineer · Ropeway consultant & inspector
m.loehr@ropes.cc
Portrait of Thomas Engl

Dipl.-Ing. Thomas Engl

Ropeway Engineer
Civil engineer (University of Innsbruck), with ROPES since 2020: ropeway engineering and approval projects, plus inspections and tests with WPK Austria. Previously general planning of ski lifts, slopes and reservoirs, and structural engineering.
t.engl@ropes.cc
Portrait of Uday Pandhe

Uday Pandhe

Area Manager India · Mumbai
22+ years in ropeways, urban mobility, PRT/ARTS and transport infrastructure. Civil engineer (VJTI Mumbai), Master’s in Advanced Construction Management (NICMAR, gold medallist).
Contact

Tell us about your project.

We reply within [2] working days – in English, German or Italian.

Vintl · Headquarters
Staatsstraße 16
39030 Vintl (BZ), Italy
Munich
Partnership office
Kaprun
Partnership office
Mumbai
Area office India
+91 79778 64717